Manufacturing For Lease • 1,050 SF
Name | Space Use | Size | Rent | Details |
---|---|---|---|---|
1st Floor Ste | Industrial | 1,050 SF | $22.00 USD/SF/YR | |
Office Warehouse
|
22' Ceiling Heights |
208v 3 Phase Power |
Secured Parking |
Monument Signage |
Dock Height and Grade Level Loading |
Two Dock High Loading Positions with Ramp |
Commuter Rail | Drive | Walk | Distance |
---|---|---|---|
Dadeland South (Metrorail Green Line - Miami-Dade Transit (Metrorail/Metromover)) | 12 min | - | 6.8 mi |
Dadeland North (Metrorail Green Line - Miami-Dade Transit (Metrorail/Metromover)) | 11 min | - | 7.6 mi |
Airport | Drive | Walk | Distance |
Miami International | 25 min | - | 14.8 mi |