Land For Sale • 1.04 AC
Current Use: container storage, container stacking, overweight container transloading, etc |
Complete Rehab Near Completion |
New Front Fence 12’ Wrought Iron on top of Block Wall will be installed. |
New Fenced off M Street 8’ high Wrought Iron and Bew Gate will be installed (Gate will side open). |
New Guard Rails and 2 New Load Levelers will be installed at the dock platform. |
Transloading Platform: 8 Dock-High Positions + 1 Ramp |
Airport | Drive | Walk | Distance |
---|---|---|---|
Long Beach (Daugherty Field) | 12 min | - | 7.0 mi |
Los Angeles International | 27 min | - | 19.1 mi |
John Wayne/Orange County | 35 min | - | 27.2 mi |