Research And Development For Sale • 50,646 SF
LAB SPACE: 90% Lab/Warehouse and approx. 6,000 SF wing of cGMP clean facility. |
CHILLERS: Two McQuay 500 Ton Chillers providing cooling to all air handler units that supply tampered air to the facility. |
FIRE SYSTEM: General Electric (EST) panel. |
GENERATOR: Cummins ONAN Generator with a load bank for testing. |
COOLING TOWER: Side Draft BAC tower. |
ACID NEUTRALIZATION: The facility has a Acid Neutralization System that is used to balance its waste water to the city. |
Commuter Rail | Drive | Walk | Distance |
---|---|---|---|
Wheat Ridge - Ward Station Track 1 (Union Station to Wheat Ridge Ward Station - Regional Transportation District) | 9 min | - | 3.7 mi |
Arvada Ridge Station Track 1 (Union Station to Wheat Ridge Ward Station - Regional Transportation District) | 11 min | - | 5.8 mi |
Airport | Drive | Walk | Distance |
Denver International | 43 min | - | 33.4 mi |
Parking Available: | Yes |
Reserved: | No |
Spaces Provided: | 100 |
Type: | Surface |
Included in Rent: | Yes |