Land For Sale • 3.67 AC
Purchase price includes the full design and completion of (est. at $7/SF): • Frontage requirements • Off-site storm retention • Connection to all utilities including water line loop and sewer
Fully SEPA approved and ready for building permit submittal |
SEPA approved for a ±66,802 SF concrete tilt industrial building with 8 dock-high doors and 2 grade-level doors |
Commuter Rail | Drive | Walk | Distance |
---|---|---|---|
Sumner Station (Sounder South Line - Central Puget Sound Regional Transit Authority Rail (Link Light Rail/Sounder)) | 11 min | - | 7.3 mi |
Airport | Drive | Walk | Distance |
Seattle-Tacoma International | 44 min | - | 27.8 mi |