Land For Sale • 0.18 AC
Your opportunity to tear down a two family and build a SIX FAMILY in its place! TO BE DELIVERED WITH THE DEMO PERMIT AND BUILDING PERMITS ready to issue, this ZBA approved project is anticipated to be fully permitted and ready to close in late 2024-early 2025. The building is designed with 6 spacious units, the majority of which have 3 bedrooms/2 baths. The units can be developed as condominiums or as rentals, there are 5 surface parking spaces and there are no affordable housing (IDP) units required. The project is designed to be an efficient and cost effective build with 3 stories of wood framing, one egress stair and no elevator needed. Top Brighton location with new construction all around! Call for details and make this your Spring project!
Brighton development opportunity |
6 large units |
To be delivered with permits ready to issue |
Commuter Rail | Drive | Walk | Distance |
---|---|---|---|
Boston Landing (Framingham/Worcester Line - MBTA) | 8 min | 20 min | 1.1 mi |
Yawkey (Framingham/Worcester Line - Massachusetts Bay Transportation Authority Commuter Rail (Purple Line)) | 6 min | - | 3.2 mi |
Transit/Subway | Drive | Walk | Distance |
Washington Street (Green Line - B - Massachusetts Bay Transportation Authority Subway (The T)) | 1 min | 8 min | 0.4 mi |
Sutherland Street Station (Green Line - B - Massachusetts Bay Transportation Authority Subway (The T)) | 1 min | 10 min | 0.5 mi |
Warren Street Station (Green Line - B - Massachusetts Bay Transportation Authority Subway (The T)) | 1 min | 12 min | 0.7 mi |
Chiswick Road Station (Green Line - B - Massachusetts Bay Transportation Authority Subway (The T)) | 1 min | 13 min | 0.7 mi |
Allston Street Station (Green Line - B - Massachusetts Bay Transportation Authority Subway (The T)) | 2 min | 16 min | 0.8 mi |
Airport | Drive | Walk | Distance |
General Edward Lawrence Logan International | 17 min | - | 9.1 mi |