Light Distribution For Lease
The shell is now built (as of June 2024) and we can sub divide as shown on page 2 of the PDF brochure. The developer will build out the interior office area as needed for a specific client. As of June 2024 the left half of the building has been leased.
| new flex space with truck loading and drive-in doors |
| Airport | Drive | Walk | Distance |
|---|---|---|---|
| Wilmington International | 5 min | - | 2.6 mi |