Manufacturing For Lease
The Cannery Palo Alto is a pioneering office/R&D project. It will be Net Zero (NZE) and Zero Net Carbon (ZNC) operationally. It’s operational energy will be carbon free as supported by NZE PV array.
| Class A+ Building, Delivering Q4 of 2025 |
| LEED Platinum |
| 2 level, 330 stall parking garage including 60+ EV charging stations |
| The Cannery is designed to maximize the amount of natural daylight entering the space through the use of skylights, light tubes, and clerestory spaces |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| 3 min | 13 min | 0.7 mi | |
| California Avenue (Caltrain - Caltrain (Caltrain)) | 3 min | 14 min | 0.7 mi |
| Transit/Subway | Drive | Walk | Distance |
| California Avenue (Caltrain - Caltrain (Caltrain)) | 4 min | 14 min | 0.7 mi |
| Airport | Drive | Walk | Distance |
| Norman Y Mineta San Jose International | 23 min | - | 15.1 mi |
| San Francisco International | 33 min | - | 23.0 mi |
| Metro Oakland International | 46 min | - | 31.7 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 120 |
| Type: | Surface |
| Included in Rent: | Yes |