Manufacturing For Lease
Less than 4 miles to I-280 45 minutes to Detroit Airport 10 miles to Port Utility ready Tax abatement in place
| 2023 Construction |
| Site can accommodate 300,000 SF |
| Heavy Power |
| Heavy Haul Routes |
| Additional 10 acres available for future expansion |
| Additional docks and grade level doors available |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| Toledo (Capitol Limited - Amtrak, Lake Shore Limited - Amtrak) | 13 min | - | 6.3 mi |
| Airport | Drive | Walk | Distance |
| Eugene F Kranz Toledo Express | 44 min | - | 24.3 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Type: | Surface |
| Included in Rent: | Yes |