Manufacturing For Sale • 14,800 SF
Manufacturing |
440 Electrical 3 phase 200 Amp |
Fenced Yard and loading docks |
Total Expenses: | $0 USD |
Commuter Rail | Drive | Walk | Distance |
---|---|---|---|
Rialto (San Bernardino Line - Southern California Regional Rail Authority (Metrolink)) | 1 min | 10 min | 0.6 mi |
Fontana (San Bernardino Line - Southern California Regional Rail Authority (Metrolink)) | 8 min | - | 4.2 mi |
Airport | Drive | Walk | Distance |
Ontario International | 22 min | - | 15.2 mi |
Parking Available: | Yes |
Reserved: | No |
Spaces Provided: | 20 |
Type: | Surface |
Included in Rent: | Yes |