• These undeveloped lands are currently leased out for Canola crop production
• The City of Leduc 2018 Transportation Master Plan Report (TMP) outlines potential future upgrades to Highway 2 (QEII). The improvements include constructing a dual freeway system, upgrades to the existing interchanges at Highway 19, Airport Road, Highway 39, and Highway 2A; new interchanges at 41 Avenue in Edmonton and 65 Avenue in Leduc to increase connectivity with surrounding lands; a new systems (freeway to freeway) interchange with a potential future east-west freeway; and reconstruction of the section of highway through Leduc to improve safety. The plans have been prepared in order to accommodate a future Edmonton Census Metropolitan Area population of 3.2 million.