Unknown For Lease • 70,426+ SF
Name | Space Use | Size | Rent | Details |
---|---|---|---|---|
1st Floor Ste | Industrial | 70,426 SF | $12.35 USD/SF/YR | |
|
||||
1st Floor Ste | Industrial | 108,640 SF | $12.35 USD/SF/YR | |
State-of-the-art construction with ESFR sprinklers, LED lighting, heavy power, and 60-foot marshaling bays.
|
||||
1st Floor Ste | Industrial | 75,000-179,062 SF | $12.35 USD/SF/YR | |
|
With greater demand for efficient industrial space, Oak West Corporate Centre (OWCC) Phase II was designed to meet the diverse requirements of Halton Region, Ontario’s innovative and growing industrial sector. OWCC Phase II builds on the success of the first phase and is set to deliver 539,000 square feet of next-generation industrial space across four buildings. Featuring a range of bay sizes, divisible options, immersive clear heights, and shipping options, these newly delivered spaces will suit a broad array of tenants. Ready for immediate occupancy, capitalize on state-of-the-art construction with ESFR sprinklers, LED lighting, heavy power, trailer parking, and 60-foot marshaling bays. The facility offers divisible options and build-to-suit office areas. Establish a presence within an advanced-manufacturing sector, an innovative life sciences community, and a superior industrial hub with access to the large GTA and Hamilton area labour pool. OWCC Phase II is situated on the south side of Queen Elizabeth Way (QEW) at the Oakville-Burlington border, with prime access to major highways, intermodal rail, and airports. Future tenants will also benefit from the development’s proximity to nearby amenities (including RioCan Centre), public transportation, and several green spaces, including Sherwood Forest Park and Bronte Beach. Reach 130 restaurants, 174 retail stores, 22 fitness centres, 11 hotels, and more within a 5-kilometre radius.
Oak West Corporate Centre (OWCC) Phase II offers over 500,000 SF of state-of-the-art industrial space across 4 buildings divisible down to 41,000 SF. |
Surrounded by numerous amenities with convenient access to 400-series highways, intermodal rail, and the Pearson International and Hamilton airports. |
Immediately available for occupancy, experience brand-new construction, LED lighting, heavy power, ESFR sprinklers, and trailer parking. |
Whether utilized for life sciences, industrial operations, or advanced manufacturing, OWCC is well-suited to meet a diverse range of needs. |
Contact the Avison Young Listing Team for details on our summer promotional offerings. |
Commuter Rail | Drive | Walk | Distance |
---|---|---|---|
Appleby Go Station Rail (Lakeshore West Train - GO Transit) | 7 min | - | 2.9 mi |
Bronte Go Station Rail (Lakeshore West Train - GO Transit) | 7 min | - | 4.1 mi |
Airport | Drive | Walk | Distance |
John C. Munro Hamilton International Airport | 37 min | - | 25.0 mi |
Billy Bishop Toronto City Airport | 41 min | - | 28.6 mi |
Toronto Pearson International | 43 min | - | 29.0 mi |