Land For Sale • 0.37 AC
| 91 Units – 100% Affordable Housing Development, RTI at COE |
| Rent Schedules: HCD Schedule VI and TCAC Schedule IX |
| Zero Parking Spaces – Cost-saving, transit-oriented design |
| Walk Score of 88 "Very Walkable" |
| Mostly Stacked Design - Type V-A Construction |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| Northridge (Ventura County Line - Southern California Regional Rail Authority (Metrolink)) | 8 min | - | 3.0 mi |
| 8 min | - | 3.1 mi | |
| Airport | Drive | Walk | Distance |
| Bob Hope | 25 min | - | 10.6 mi |
| Los Angeles International | 34 min | - | 23.3 mi |
| Long Beach (Daugherty Field) | 53 min | - | 40.8 mi |