Back on the market!! Two lots being sold separately or together. Unique location for development. 4 lanes from Old Pasco Road to I-75 being developed along with a new interchange at I-75 and Overpass Road. Six lanes plus two auxiliary lanes from I-75 to Boyette Road. In addition to these improvements, the existing Blair Drive access to Overpass Road will be closed and a new 2-lane paved roadway will be constructed with a connection to Old Pasco Road. The project limits extend from Old Pasco Road on the West to US 301 on the East for a total length of approximately 9.0 miles. The overpass project is consistent with locally adopted plans.