Service For Sale • 29,747 SF
| Roof is an EPDM ballasted roof and was fully replaced in September 2023. |
| Loading dock drive lane was replaced with concrete in October 2023. |
| Exterior of the building was completely tuckpointed and painted in September 2023. |
| Platform stairs by loading dock were replaced in April 2024. |
| Commuter Rail | Drive | Walk | Distance |
|---|---|---|---|
| Antioch Station (North Central Service - Northeast Illinois Regional Commuter Railroad (Metra)) | 17 min | - | 7.8 mi |
| Airport | Drive | Walk | Distance |
| General Mitchell International | 43 min | - | 33.5 mi |
| Parking Available: | Yes |
| Reserved: | No |
| Spaces Provided: | 77 |
| Type: | Surface |
| Included in Rent: | Yes |