Distribution For Lease • 509,760 SF
Name | Space Use | Size | Rent | Details |
---|---|---|---|---|
1st Floor Ste | Industrial | 509,760 SF | Rate Upon Request | |
Ready for occupancy, (±) 509,760 SF available, ±2,500 SF spec office space, 40’ minimum clear height, 25MW of power capacity immediately available to the project site with ability for expansion up to 50 MW, 50 dock doors, 61 future dock door positions, 2 drive-in doors, 254 car parking stalls, 251 trailer parking stalls (Total on-site / 128 East / 123 West), 4000A main electrical service, Tax abatement in place, Inquire with broker for lease rate.
|
State of the art cross dock, distribution buildings, Business friendly community, Zoned: Industrial, Fixed Pilot: $0.34/SF ($0.29 for manufacturing uses), Class-A tilt wall construction, (±) 509,760 SF available, 40’ minimum clear height, 50 dock doors, 61 future dock door positions, 2 drive-in doors, 254 car parking stalls, 251 trailer parking stalls (Total on-site / 128 East / 123 West), 4000A main electrical service, Tax abatement in place, July 2024 occupancy, Inquire with broker for lease rate. 25MW of power capacity immediately available to the project site with ability for expansion up to 50 MW
Street/Transportation: new 3 lane Edgerton Road & 103rd Street with 6 access points |
Edgerton Road Improvements, completed Q2 2023 |
103rd Street Improvements, Q4 2024 completion |
High Pressure Gas Main Extension (Atmos Gas), Q2 2024 completion |
Transmission and Distribution Electrical Upgrades (Evergy), Q2 2024 completion. Evergy Substation Upgrades, Q4 2023 completion |
25MW of power capacity immediately available to the project site with ability for expansion up to 50 MW |
Airport | Drive | Walk | Distance |
---|---|---|---|
Kansas City International | 58 min | - | 49.6 mi |
Parking Available: | Yes |
Reserved: | No |
Spaces Provided: | 254 |
Type: | Surface |
Included in Rent: | Yes |